|
New York State Route 135 (NY 135) is a state highway in eastern Nassau County, New York, in the United States. The route is a limited-access highway that connects Seaford with Syosset. The highway runs from Merrick Road (unsigned County Route 27 or CR 27) in Seaford to NY 25 in Syosset. In between, NY 135 passes through Bethpage and Plainview and serves Bethpage State Park. The highway is ceremoniously designated as the Ralph J. Marino Expressway; however, it is more commonly known as the Seaford–Oyster Bay Expressway. The origins of the expressway date back to 1954 when engineering pioneer Robert Moses proposed that a highway be built between Wantagh and Oyster Bay. Although communities along the proposed path of the highway opposed its construction, Moses eventually won the grant. Right-of-way was taken in 1958, and construction began in 1959. In 1967, the name of the expressway was renamed from the Wantagh–Oyster Bay Expressway to its current name. The expressway was completed to its current length in 1969; however, a stub exists at each end of the highway. The freeway was designated as NY 135 by 1964. Around 1970, Robert Moses returned his focus to the expressway, proposing that the highway be extended north from Syosset. This extension would include a long bridge to Rye in Westchester County across the Long Island Sound. The plan received support until it was brought to the federal government, at which point towns began opposing his plans. Governor Nelson Rockefeller canceled the proposed extension in 1973. In 2007, a developer proposed building a tunnel to Rye instead. There have also been plans for a southern extension to Jones Beach, but none have been acted on. ==Route description== The Seaford–Oyster Bay Expressway northbound lanes begins at the onramp from Merrick Road (unsigned CR 27) near the outer limits of downtown Seaford in southeastern Nassau County. There is an aging sign at the southern terminus, depicting the highway as "NY 135" and showing the nearest control city as Oyster Bay. The offramp begins at a commercial building and turns to the northeast, heading through some trees. After a short distance, the onramp merges into the northbound lanes of the expressway. The expressway progresses northward from the onramp, crossing over Waverly Avenue and passing the first guide sign for exit 2 (NY 27), about ahead from this point. The highway widens to three lanes in each direction as it comes upon the interchange with NY 27. The highway progresses its way northward through the interchange and passes by the first NY 135 northbound shield in the middle of the exit. Trees mainly separate the expressway from the nearby highways and communities. After a short distance, the onramp from NY 27 merges into the northbound lanes, and the highway continues northward.〔 On the southbound side, across from the onramp, the southbound lanes split for exit 2E, set specifically for the eastbound alignment of NY 27. Shortly afterward the expressway crosses under both directions of NY 27 on separate bridges. After that, Seamans Neck Road becomes the service road to the expressway, running parallel to the east. There is a bridge over Clark Street in the nearby community of Massapequa, where West Seamans Neck Road, the southbound service road, ends. After a short distance, Seamans Neck Road ends at exit 3 for NY 105.〔 After a while, the expressway passes the North Wantagh Park, and connects to the Southern State Parkway at exit 4. There, the expressway makes a curve to the northeast, crossing over Cordwood Lane on an overpass. The direction of the expressway begins to straighten, until exit 5, where it encounters NY 107. Soon after, the expressway comes upon exit 6, which is for Boundary Avenue, a connector to the nearby Bethpage State Parkway. From there, the expressway turns to the north and begins to parallel the Bethpage Parkway as it meets NY 24 (Hempstead Turnpike).〔 North of NY 24 in Bethpage, NY 135 has an exit leading to Powell Avenue and Plainview Road, the latter serving as a local continuation of the Bethpage Parkway. At this point, the median of the expressway widens as the route heads northward.〔 The wide median was originally constructed to allow the Bethpage Parkway to be extended north to the Caumsett State Parkway and Caumsett State Park. The wide median ends just before exit 9 as the lanes of NY 135 come back together for the exit with Cherry Avenue and Broadway. After interchange 9, the expressway enters Plainview as it crosses over Haypath Road.〔 As the expressway passes through Plainview it passes beneath Old Country Road at exit 10. Seven interchanges north of the Southern State Parkway, NY 135 comes upon the Northern State Parkway at exit 12. Just after, there is a partial cloverleaf interchange (exit 13) with the Long Island Expressway (I-495) in Locust Grove. The expressway continues north of I-495, heading through Locust Grove to interchanges 14E and 14W. Here, NY 135 ends and merges into NY 25 (the Jericho Turnpike). A stub built for the possible extension of the expressway sits nearby. All traffic merges onto NY 25 west from there.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「New York State Route 135」の詳細全文を読む スポンサード リンク
|